Surface Treatment — Prime Coat on Granular Base
Prime Coat on Granular Base material and rate calculation.
Prime is absorption, not glue — it must soak INTO the granular base and bind its surface fines. A prime that puddles was over-shot or the base was sealed too tight; a prime that disappears in an hour under-shot a loose base. The cure time entered is real schedule: paving on green prime makes slip planes.
Formula
Note: Paving estimates only — the project mix design, agency specification and the plant's QC data govern. Temperature models are simplified; verify with an infrared gun and density gauge on the mat.
Prime Coat on Granular Base material and rate calculation. A free asphalt paving temperature & logistics tool — no sign-up, no upload, instant results in your browser.
About Surface Treatment — Prime Coat on Granular Base
Surface Treatment — Prime Coat on Granular Base computes the governing relationship V = rate × area live as you type. Prime is absorption, not glue — it must soak INTO the granular base and bind its surface fines. A prime that puddles was over-shot or the base was sealed too tight; a prime that disappears in an hour under-shot a loose base. The cure time entered is real schedule: paving on green prime makes slip planes. Defaults are pre-filled with realistic values for this exact scenario, and the worked example substitutes your numbers step by step so the math is never a black box.
How to use Surface Treatment — Prime Coat on Granular Base
- 1Enter your values — Application rate, Base area, Cure allowance (sensible defaults are pre-filled).
- 2Read the live results: Prime material, 20 kL tankers.
- 3Check the "with your numbers" line to see V = rate × area substituted step by step.
- 4Adjust inputs until the scenario matches yours, then copy or share the result.
Why use Surface Treatment — Prime Coat on Granular Base?
- ✓Instant, free and private — every calculation runs client-side in your browser; nothing is uploaded
- ✓Built on the stated formula V = rate × area with authoritative sources cited on the page (NAPA — HMA paving handbook & best practices; Asphalt Institute MS-2 — Mix design methods)
- ✓Prime is absorption, not glue — it must soak INTO the granular base and bind its surface fines.
- ✓SI ⇄ Imperial toggle converts your inputs in place, so you can work in the units your drawings use
Frequently asked questions
What formula does the surface treatment — prime coat on granular base use?+
It evaluates V = rate × area, exactly as published. Sources: NAPA — HMA paving handbook & best practices; Asphalt Institute MS-2 — Mix design methods. The substituted worked example on the page lets you verify every step against the textbook.
How should I read the result — and how far can I trust it?+
Prime is absorption, not glue — it must soak INTO the granular base and bind its surface fines. Paving estimates only — the project mix design, agency specification and the plant's QC data govern. Temperature models are simplified; verify with an infrared gun and density gauge on the mat.
When is this calculator the right tool for the job?+
Prime Coat on Granular Base material and rate calculation. A free asphalt paving temperature & logistics tool. A prime that puddles was over-shot or the base was sealed too tight; a prime that disappears in an hour under-shot a loose base. For neighbouring scenarios, the related tools below cover the same engine with different presets.
Does it support both metric and imperial units?+
Yes — the SI ⇄ Imperial toggle converts the values already in the fields, preserving the physical quantity, so you can flip mid-calculation without re-entering anything.
Related tools
- Surface Treatment — Chip Seal Spread
- Surface Treatment — Fog Seal
- Surface Treatment — Milling Production
- Surface Treatment — Micro-Surfacing
- Surface Treatment — Crack Sealing
- Surface Treatment — Rejuvenator Treatment
- Surface Treatment — Patch Material
- Connection Screen — Fillet Weld Line Capacity
- Fuel & Energy — Idle Time Cost
Related Manufacturing tools
Spindle Speed Calculator — Aluminum 6061
Carbide starting RPM for milling Aluminum 6061: n = 1000·Vc/(π·D) with a handbook cutting speed preset.
● LiveSpindle Speed Calculator — Mild Steel 1018
Carbide starting RPM for milling Mild Steel 1018: n = 1000·Vc/(π·D) with a handbook cutting speed preset.
● LiveSpindle Speed Calculator — Stainless 304
Carbide starting RPM for milling Stainless 304: n = 1000·Vc/(π·D) with a handbook cutting speed preset.
● Live