Solar Pump Subsidy Calculator (PM-KUSUM)
Calculate the subsidy split and your out-of-pocket cost for a solar agriculture pump under PM-KUSUM.
PM-KUSUM Component B standard structure: 30% central subsidy + 30% state subsidy + 30% bank loan, leaving ~10% farmer contribution (NE/hill states get higher central share). Subsidy applies to benchmark costs per pump capacity (HP); the loan portion is repayable โ only the 60% is a grant.
Indicative planning figures based on published research averages. Local soil tests, varieties and weather change actual requirements โ confirm with your agronomist or extension officer.
Disclaimer: This tool is for general informational and estimation purposes only and is not professional financial, tax, accounting or legal advice. All figures are estimates โ verify with a qualified professional before making decisions. Read the full disclaimer.
Farmers and agri-students use the free Solar Pump Subsidy Calculator (PM-KUSUM) for an instant, accurate farm-economics answer โ no formulas to remember, works offline.
About Solar Pump Subsidy Calculator (PM-KUSUM)
PM-KUSUM puts a solar pump within reach by stacking support: in the standard Component B structure, 30% central plus 30% state subsidy are outright grants, a 30% bank loan spreads most of the rest, and the farmer brings only ~10% upfront. This calculator splits any benchmark cost into those four parts โ and keeps them honest: the loan is repayable (size the EMI against your diesel savings), and subsidy applies to MNRE benchmark costs per pump HP, not arbitrary market quotes. For diesel-pump farmers, the economics are usually compelling: the ~10% contribution often repays within a year or two of diesel saved.
How to use Solar Pump Subsidy Calculator (PM-KUSUM)
- 1Enter your crop/farm figures into the inputs.
- 2Read the headline result and the supporting breakdown.
- 3Apply the guidance in the note to your selling and investment decisions.
Why use Solar Pump Subsidy Calculator (PM-KUSUM)?
- โUses the standard, citable farm-economics method
- โClear inputs with realistic Indian defaults
- โInstant result with the full working shown
- โFree, fully in-browser and private
Frequently asked questions
How much subsidy do I get on a solar pump under PM-KUSUM?+
Typically 60% as grant (30% central + 30% state) plus a 30% bank loan, leaving about 10% as your contribution โ on the benchmark cost for the pump capacity. North-eastern and hill states get a higher central share. Apply through your state nodal agency.
Is the solar pump loan also subsidy?+
No โ the ~30% bank loan is repayable with interest; only the 60% government share is a grant. But diesel savings usually cover the EMI comfortably: replacing โน40,000โ60,000 of annual diesel typically clears a โน90,000 loan within 2โ3 years.
Is this tool free and private?+
Yes โ free, no sign-up, and all calculation runs in your browser, so it works offline at the farm and your data never leaves the device.
Related Agri tools
Tractor Fuel Consumption Calculator
Estimate your tractor's diesel consumption per hour from its horsepower, load and specific fuel consumption.
โ LiveTractor Fuel Cost Per Acre Calculator
Convert your tractor's fuel use per hour into diesel litres and cost per acre for any field operation.
โ LiveImplement Field Capacity Calculator
Calculate the effective field capacity (ha/h and acres/h) of any implement from width, speed and field efficiency.
โ Live