ToolJoltTools

Thrust & Torque — 7 m EPB (Pressure Term)

Cutterhead thrust and torque estimate for a 7 m epb (pressure term).

0
Total thrust required (MN)
0
Breakout torque (MN·m)

Pressurized machines add the face-pressure term: 3 bar across a 7 m face is ~11.5 MN of thrust before a single cutter touches ground. Forgetting this term is the classic under-sized-jacks story in soft-ground bids.

Formula

thrust = (n·F + p·A) × (1+friction) · T ≈ α·D³
References: Maidl et al., Mechanised Shield Tunnelling, 2nd ed.; Colorado School of Mines TBM performance model

Note: Planning-level tunnelling estimate — actual TBM performance is set by detailed geotechnical baseline data, machine design and the contractor's means & methods. Use for feasibility framing only.

Cutterhead thrust and torque estimate for a 7 m epb (pressure term). A free tbm performance & tunnelling tool — no sign-up, no upload, instant results in your browser.

About Thrust & Torque — 7 m EPB (Pressure Term)

Thrust & Torque — 7 m EPB (Pressure Term) computes the governing relationship thrust = (n·F + p·A) × (1+friction) · T ≈ α·D³ live as you type. Pressurized machines add the face-pressure term: 3 bar across a 7 m face is ~11.5 MN of thrust before a single cutter touches ground. Forgetting this term is the classic under-sized-jacks story in soft-ground bids. Defaults are pre-filled with realistic values for this exact scenario, and the worked example substitutes your numbers step by step so the math is never a black box.

How to use Thrust & Torque — 7 m EPB (Pressure Term)

  1. 1Enter your values — Disc cutters, Force per cutter, Diameter, Shield friction & drag share and more (sensible defaults are pre-filled).
  2. 2Read the live results: Total thrust required, Breakout torque.
  3. 3Check the "with your numbers" line to see thrust = (n·F + p·A) × (1+friction) · T ≈ α·D³ substituted step by step.
  4. 4Adjust inputs until the scenario matches yours, then copy or share the result.

Why use Thrust & Torque — 7 m EPB (Pressure Term)?

  • Instant, free and private — every calculation runs client-side in your browser; nothing is uploaded
  • Built on the stated formula thrust = (n·F + p·A) × (1+friction) · T ≈ α·D³ with authoritative sources cited on the page (Maidl et al., Mechanised Shield Tunnelling, 2nd ed.; Colorado School of Mines TBM performance model)
  • Pressurized machines add the face-pressure term: 3 bar across a 7 m face is ~11.5 MN of thrust before a single cutter touches ground.
  • Niche-specific defaults give a meaningful worked answer the moment the page loads

Frequently asked questions

What formula does the thrust & torque — 7 m epb (pressure term) use?+

It evaluates thrust = (n·F + p·A) × (1+friction) · T ≈ α·D³, exactly as published. Sources: Maidl et al., Mechanised Shield Tunnelling, 2nd ed.; Colorado School of Mines TBM performance model. The substituted worked example on the page lets you verify every step against the textbook.

How should I read the result — and how far can I trust it?+

Pressurized machines add the face-pressure term: 3 bar across a 7 m face is ~11.5 MN of thrust before a single cutter touches ground. Planning-level tunnelling estimate — actual TBM performance is set by detailed geotechnical baseline data, machine design and the contractor's means & methods. Use for feasibility framing only.

When is this calculator the right tool for the job?+

Cutterhead thrust and torque estimate for a 7 m epb (pressure term). A free tbm performance & tunnelling tool. Forgetting this term is the classic under-sized-jacks story in soft-ground bids. For neighbouring scenarios, the related tools below cover the same engine with different presets.

Do I need to install anything or create an account?+

No. The tool is pure client-side JavaScript: open the page and it works, offline once loaded, with no account, no quota and no data leaving your device.

Related tools

Related Manufacturing tools

Sponsored