Trucks required for small trucks (tight sites) from haul distance, speeds and plant rate.

0
Cycle time (min)
0
Trucks required
0
Mix on the road at any time (t)

Six-wheelers carry 8–10 t and fit where semis can't — at triple the per-tonne handling overhead. Their honest cycle includes maneuvering time at both ends that big-truck math never sees; the default load/unload entries here are already stretched for it.

Formula

cycle = 2d/v + ends · N = TPH ÷ (payload/cycle)
References: NAPA — HMA paving handbook & best practices

Note: Paving estimates only — the project mix design, agency specification and the plant's QC data govern. Temperature models are simplified; verify with an infrared gun and density gauge on the mat.

Trucks required for small trucks (tight sites) from haul distance, speeds and plant rate. A free asphalt paving temperature & logistics tool — no sign-up, no upload, instant results in your browser.

About Truck Fleet — Small Trucks (Tight Sites)

Truck Fleet — Small Trucks (Tight Sites) computes the governing relationship cycle = 2d/v + ends · N = TPH ÷ (payload/cycle) live as you type. Six-wheelers carry 8–10 t and fit where semis can't — at triple the per-tonne handling overhead. Their honest cycle includes maneuvering time at both ends that big-truck math never sees; the default load/unload entries here are already stretched for it. Defaults are pre-filled with realistic values for this exact scenario, and the worked example substitutes your numbers step by step so the math is never a black box.

How to use Truck Fleet — Small Trucks (Tight Sites)

  1. 1Enter your values — One-way haul distance, Average haul speed, Load + ticket time, Unload/paver time and more (sensible defaults are pre-filled).
  2. 2Read the live results: Cycle time, Trucks required, Mix on the road at any time.
  3. 3Check the "with your numbers" line to see cycle = 2d/v + ends · N = TPH ÷ (payload/cycle) substituted step by step.
  4. 4Adjust inputs until the scenario matches yours, then copy or share the result.

Why use Truck Fleet — Small Trucks (Tight Sites)?

  • Instant, free and private — every calculation runs client-side in your browser; nothing is uploaded
  • Built on the stated formula cycle = 2d/v + ends · N = TPH ÷ (payload/cycle) with authoritative sources cited on the page (NAPA — HMA paving handbook & best practices)
  • Six-wheelers carry 8–10 t and fit where semis can't — at triple the per-tonne handling overhead.
  • SI ⇄ Imperial toggle converts your inputs in place, so you can work in the units your drawings use

Frequently asked questions

What formula does the truck fleet — small trucks (tight sites) use?+

It evaluates cycle = 2d/v + ends · N = TPH ÷ (payload/cycle), exactly as published. Sources: NAPA — HMA paving handbook & best practices. The substituted worked example on the page lets you verify every step against the textbook.

How should I read the result — and how far can I trust it?+

Six-wheelers carry 8–10 t and fit where semis can't — at triple the per-tonne handling overhead. Paving estimates only — the project mix design, agency specification and the plant's QC data govern. Temperature models are simplified; verify with an infrared gun and density gauge on the mat.

When is this calculator the right tool for the job?+

Trucks required for small trucks (tight sites) from haul distance, speeds and plant rate. A free asphalt paving temperature & logistics tool. Their honest cycle includes maneuvering time at both ends that big-truck math never sees; the default load/unload entries here are already stretched for it. For neighbouring scenarios, the related tools below cover the same engine with different presets.

Does it support both metric and imperial units?+

Yes — the SI ⇄ Imperial toggle converts the values already in the fields, preserving the physical quantity, so you can flip mid-calculation without re-entering anything.